PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Poured concrete at Stair -5 slab Facing West (800x600).jpg Stair -5 Delivery Facing South-East (800x600).jpg Started installing the underground sanitary piping at Room 105 (Servery) Facing North-West (800x600).jpg Backfilled and compacted at Rahway Ave. Facing the Administration Building (800x600).jpg Erecting Derrcik -3 3rd Floor Facing North (800x600).jpg Erecting Derrick -3 (2nd and 3rd Floor) Facing South-East (800x600).jpg Excavation at Rahway Ave. Pic -1 (800x600).jpg Excavation at Rahway Ave. Pic -2 (800x600).jpg Installing underground sanitary piping at Room 105 (Servery) Facing West (800x600).jpg
Previous pageNext page Erecting Derrcik -3 3rd Floor Facing North (800x600)
Erecting Derrcik -3 3rd Floor Facing North (800x600)